INTER-FLOOR LEAKAGE

In Brief

Inter-Floor leakage is one of the common complaints received by strata building proprietors. Inter-floor leakage occurs when there is evidence of dampness, moisture or water penetration on the ceiling or any furnishing material that is attached, glued, laid or applied to the ceiling that forms part of the interior of a parcel, common property or limited common property depending on the case.

Q:

Who is responsible when inter-floor leakage occurs in your unit?

A: If the defects happen within the Defect Liability Period (DLP) or within 24 months upon vacant possession, the responsibility is upon the developer. This is covered by the provisions of the Sale and Purchase Agreement (SPA). If there is a leak on the ceiling, it is believed to come from the unit above until it is proven otherwise under Section 142 of the Strata Management Act 2013 (SMA).

Q:  How do you deal with inter-floor leaking in your condominium?

A: Firstly, the affected owners must give notice of the leakage (“the notice”) to the Developer, Joint Management Body, Management Corporation or subsidiary management corporation (collectively referred to as “Management”)

Management must conduct an examination within (7) days to determine the source of the leak and the person responsible. After the manager has completed the inspection, he must give a Certificate of Inspection (Form 28) within five days.

Q: What if the affected owner is not satisfied with the results of the inspection by the management?

A:  If he/she is not satisfied, he/she may refer the matter to the Commissioner of building (COB) who shall then determine the cause of the leakage and the party responsible to rectify it by appointing a registered architect, engineer, quantity surveyor or building surveyor to assist him. The cost of appointment shall be borne by the party responsible to rectify the leakage.

Q:  Does the building management have access to check and fix their property inter-floor leakage occurs? What happens if they refuse?

A: Owners shall give full access to the building management provided that (7) days of written notice is given to the parcel owner.

Any parcel owner who fails to give access to the building management to carry out inter-floor inspection or rectification is an offence and shall, on conviction, be liable to a fine not exceeding RM 50,000.00 or imprisonment for a term not exceeding 3 years or both.

Q:  What if the responsible party failed or refused to carry out their responsibilities in line with the Strata Management (Maintenance and Management) Regulation 2015 (SMR)?

A:  The affected parcel owner may commence civil proceedings in court or refer the matter to the Strata Management Tribunal.

Recent Post

ROAD ACCIDENT – INSURANCE COMPANY STRIKES BACK: HIGH COURT OVERTURNS ROAD ACCIDENT CLAIM

When a motorcyclist claimed he was knocked down in an accident, the Sessions Court ruled in his favor, holding the other rider fully liable. But the insurance company wasn’t convinced. They appealed, arguing that there was no proof of a collision and even raised suspicions of fraud. The High Court took a closer look – and in a dramatic turn, overturned the decision, dismissed the claim, and awarded RM60,000 in costs to the insurer. This case is a stark reminder that in court, assumptions don’t win cases – evidence does.

Read More »

CHARTERPARTY – LIEN ON SUB-FREIGHTS: CLARIFYING OWNERS’ RIGHTS AGAINST SUB-CHARTERERS

In Marchand Navigation Co v Olam Global Agri Pte Ltd and Anor [2025] 1 Lloyd’s Rep 92, the Singapore High Court upheld the owners’ right to enforce a lien on sub-freights under Clause 18 of the NYPE 1946 charterparty, ruling that the phrase ‘any amounts due under this charter’ was broad enough to cover unpaid bunker costs. Despite an arbitration clause between the owners and charterers, the sub-charterer was obligated to honor the lien, as it was not a party to the arbitration agreement. This decision reinforces that a properly exercised lien on sub-freights can be an effective tool for owners to recover unpaid sums, even in the presence of disputes between charterers and sub-charterers.

Read More »

SHIP SALE – LOSING THE DEAL, LOSING THE DAMAGES? THE LILA LISBON CASE AND THE LIMITS OF MARKET LOSS RECOVERY

In “The Lila Lisbon” [2025] 1 Lloyd’s Rep 101, the court ruled that a buyer cancelling under Clause 14 of the Norwegian Salesform Memorandum of Agreement is not automatically entitled to loss of bargain damages unless the seller is in repudiatory breach. The case clarifies that failing to deliver by the cancellation date does not constitute non-delivery under the English Sale of Goods Act 1979, as the clause grants the buyer a discretionary right rather than imposing a firm obligation on the seller. This decision highlights the importance of precise contract drafting, particularly in ship sale agreements, where buyers must ensure that compensation for market loss is explicitly provided for.

Read More »

CRIMINAL – KIDNAPPING – NO ESCAPE FROM JUSTICE: COURT UPHOLDS LIFE SENTENCE IN HIGH-PROFILE KIDNAPPING CASE

A 10-year-old child was abducted outside a tuition center, held captive, and released only after a RM1.75 million ransom was paid. The appellants were arrested following investigations, with their statements leading to the recovery of a portion of the ransom money. Despite denying involvement, they were convicted under the Kidnapping Act 1961 and sentenced to life imprisonment and ten strokes of the whip. Their appeal challenged the identification process, the validity of the charge, and the admissibility of evidence, but the court found the prosecution’s case to be strong, ruling that the appellants had acted in furtherance of a common intention and were equally liable for the crime.

Read More »

TRADEMARK – BUSINESS SABOTAGE AND TRADEMARK MISUSE

Businesses must be vigilant in protecting their contractual rights, brand identity, and operational control. In this case, unauthorized control over online booking platforms, misleading alterations to the hotel’s digital presence, and continued use of trademarks post-termination led to significant legal consequences. This ruling highlights the importance of clear agreements, strict compliance with contractual obligations, and proactive enforcement of intellectual property rights.

Read More »

NAVIGATION AND SHIPPING LAW – COLLISION REGULATIONS – COLLISION AT SEA – A WAKE-UP CALL FOR ADHERING TO NAVIGATION RULES

The collision between the FMG Sydney and MSC Apollo highlights the critical importance of adhering to established navigation rules. Deviations, delayed actions, and reliance on radio communications instead of clear, early maneuvers can lead to disastrous outcomes. This case serves as a stark reminder for mariners: follow the rules, act decisively, and prioritize safety above assumptions.

Read More »
zh_TWZH
× 联系我们